Traffic Data Analysis · Volumes & classification

ATC Count

ATC count requirements are scoped around the location, equipment approach, class scheme and delivery intervals required for the project. Scope automatic traffic count outputs around a suitable site, equipment approach, class scheme and reporting interval.

100% manual video analysis — no automated or AI counting

3D render of an automatic traffic counter tube laid across a two-lane road

In simple terms

ATC Count, explained simply.

Automatic traffic counters (such as road tubes or radar) record traffic over long periods. We turn supplied ATC data into clear reports — and, where you supply matching video, manually count samples to check the counter is right.

Example scenario (hypothetical)

A highways team has two weeks of tube-counter data and wants a manual video check of one day to confirm its class split.

Also known as: automatic traffic count · tube count reporting · ATC classification · pneumatic tube data

What the study provides

  • Recorded by equipment / site, volume or class, coverage window, retrieval / output

Typical use cases

  • Network monitoring
  • Volume studies
  • Classification

Why it matters

ATC Count: why it matters.

Automatic counters run for weeks cheaply but can misclassify. Pairing ATC data with a manual video check gives long-duration volumes with a classification you can trust.

Method
100% manual video analysis
Category
Volumes & classification
Typical intervals
15-minute, hourly, daily
Formats
Excel, CSV or your template

How it’s measured

ATC Count: how it’s measured.

manualautomatic
  1. 1ATC data imported by interval
  2. 2Classes mapped to your scheme
  3. 3Manual video sample counted
  4. 4Differences explained

Simplified illustration. Exact sites, movements and classes are defined for each project.

Our process

How we deliver your atc count, step by step.

Six documented stages, from your brief to cleaned ATC volume and class files plus a comparison against the manual check periods.

  1. 01

    Share your brief

    Send the ATC files, site details, class scheme and any matching video.

  2. 02

    Footage review

    For validation, we check the video covers the counter’s detection zone.

  3. 03

    Scope & definitions agreed

    Class mapping between the ATC output and your scheme is agreed.

  4. 04

    Manual counting

    Analysts manually count the video samples used to check the ATC data. No automated or AI counting is used.

  5. 05

    Independent quality check

    Counter outputs are reformatted, then sampled intervals are compared against a manual video count.

  6. 06

    Delivery

    Cleaned ATC volume and class files plus a comparison against the manual check periods.

Inputs, deliverables and quality

Inputs required

  • Send the ATC files, site details, class scheme and any matching video.
  • For validation, we check the video covers the counter’s detection zone.

Deliverables

  • Cleaned ATC volume and class files plus a comparison against the manual check periods.

Quality checks

  • Equipment suitability and placement
  • Clock and data continuity
  • Equipment or retrieval exceptions
Method
Confirm equipment suitability, count location, class scheme, installation constraints, coverage window and retrieval plan before deployment.

We analyse footage you supply. If it hasn’t been recorded yet, say so in your enquiry — recording arrangements are discussed separately.

Example output

ATC Count: sample output.

Typical intervals: 15-minute, hourly, daily. Real deliverables follow your scope, class scheme and template.

ATC Count — manual count vs automatic counter Illustrative synthetic example — not client data
IntervalManual (video)CounterDifferenceObserved cause
10:00–10:15216242−4Lane straddling
10:15–10:302182410—
10:30–10:45261193−5Close following
10:45–11:00217220+2Double detection

Common challenges

ATC Count: common challenges, and how we handle them.

  1. Tubes miscounting in congestion

    Manual counts for the same periods show where the counter under- or over-counts.

  2. Class schemes that do not match

    A mapping between the counter’s classes and your scheme is agreed first.

  3. Gaps in counter data

    Missing periods are listed rather than filled.

FAQs

ATC Count: frequently asked questions.

Still have a question? Ask our team.

Do you install ATC equipment?

No. We report and validate data you supply; our counting is always manual video analysis.

Do you install the counters?

No. We report and check data from counters you or your contractor installed, and manually count supplied video.

Which counter formats can you read?

Common exports from tube, radar and loop counters; send a sample file with your brief.

Can a manual check replace the ATC entirely?

For short periods, yes. For multi-week volumes, ATC plus a manual check is usually more economical.

What do you need from the counter?

The raw or binned export, the class scheme the counter uses and the installation notes for each site.

Is ATC suitable for every site?

No. Location, power, mounting, traffic mix and required classes must be reviewed first.

Can ATC replace video review?

It depends on the study question and required detail; automatic counts may not show movements or fine classes.

Get a quote for your atc count

Share the study type, sites and approximate footage hours. We’ll confirm scope and reply with a quotation.