Traffic Data Analysis · Intersections & signals
Saturation Flow Surveys
A saturation flow survey records how quickly a standing queue discharges across the stop line once the signal turns green — the key input for calibrating signal timing and junction capacity models.
100% manual video analysis — no automated or AI counting

In simple terms
Saturation Flow Surveys, explained simply.
When a light turns green, queued traffic moves off at a steady maximum rate. A saturation flow survey measures that rate, lane by lane, so signal timings and junction models reflect how drivers really behave at that site.
Example scenario (hypothetical)
A junction model shows capacity problems; measured discharge rates replace default values so the model reflects reality.
Also known as: saturation flow measurement · discharge rate survey · signal capacity survey · sat flow study
What the study provides
- Vehicles discharged per saturated green interval, by lane
- Start of green, end of saturation and lost-time observations
- Classified discharge where heavy vehicles must be separated
- Cycle-by-cycle records for agreed periods
Typical use cases
- Signal timing and phasing design
- Junction model calibration (e.g. LinSig, TRANSYT, Synchro, SIDRA)
- Before-and-after studies of signal changes
Why it matters
Saturation Flow Surveys: why it matters.
Default saturation flows in junction models can be far from reality. Measured discharge rates make capacity results credible, especially where heavy vehicles, gradients or turning radii slow departures.
- Method
- 100% manual video analysis
- Category
- Intersections & signals
- Typical intervals
- Per signal cycle
- Formats
- Excel, CSV or your template
How it’s measured
Saturation Flow Surveys: how it’s measured.
- 1Start of green taken from the signal
- 2Vehicles timed crossing the stop line
- 3Only saturated periods used
- 4Lane-by-lane results
Simplified illustration. Exact sites, movements and classes are defined for each project.
Our process
How we deliver your saturation flow surveys, step by step.
Six documented stages, from your brief to cycle-by-cycle saturated counts and times per lane, an excluded-cycle register and lane averages.
- 01
Share your brief
Tell us the junction, lanes, cycles to survey and the method or standard you follow.
- 02
Footage review
We check the stop line, signal heads (or a phase log) and the full queue are visible.
- 03
Scope & definitions agreed
Saturation start/end rules and heavy-vehicle treatment are agreed in writing.
- 04
Manual counting
Analysts time each vehicle crossing the stop line during saturated green, cycle by cycle. No automated or AI counting is used.
- 05
Independent quality check
Start-of-green times are verified against the signal head on every cycle used, and excluded cycles are double-checked.
- 06
Delivery
Cycle-by-cycle saturated counts and times per lane, an excluded-cycle register and lane averages.
Inputs, deliverables and quality
Inputs required
- Footage showing the stop line, signal heads (or a reliable phase record) and the full queue
- Lanes to be measured and the measurement method required
- Class rules for heavy vehicles and passenger-car-unit treatment, if any
Deliverables
- Cycle-by-cycle discharge tables by lane
- Saturated-period summaries with method notes
- Excluded-cycle register (e.g. blocked exits, unsaturated green)
Quality checks
- Only genuinely saturated portions of green are used
- Signal state verified from footage or the supplied phase record
- Blocked or disrupted cycles excluded and recorded
We analyse footage you supply. If it hasn’t been recorded yet, say so in your enquiry — recording arrangements are discussed separately.
Example output
Saturation Flow Surveys: sample output.
Typical intervals: Per signal cycle. Real deliverables follow your scope, class scheme and template.
| Cycle | Start of green | Saturated period (s) | Vehicles | Flow (veh/h) |
|---|---|---|---|---|
| 1 | 08:00:12 | 24 | 13 | 1,764 |
| 2 | 08:01:42 | 30 | 15 | 1,452 |
| 3 | 08:03:12 | 20 | 9 | 1,690 |
| 4 | 08:04:42 | — | — | Excluded: exit blocked |
Common challenges
Saturation Flow Surveys: common challenges, and how we handle them.
Green periods that are not fully saturated
Only the saturated portion of green is timed; the rest is excluded and logged.
Exit blocking that stops discharge
Affected cycles are excluded with the reason recorded.
Heavy vehicles in the queue
Classes are recorded per departing vehicle so PCU factors can be applied.
From SWAT Alliance Insights
Saturation Flow Surveys: insights from our team.
Explainers our analysts published on the questions behind this study.
Which method do you follow?
We apply the method you specify (for example a national guidance method) and record the raw data so results can be recalculated.
How many cycles do you need?
Enough saturated cycles to give a stable average for each lane; the brief should cover peak periods when queues reliably form.
Do you report flow per hour?
Yes, saturated counts are converted to an hourly rate per lane alongside the raw data.
Can you measure saturation flow for turning lanes?
Yes, if the turning lane queues reliably and the stop line is visible.
Do you record lost time at the start of green?
Yes. Start-up lost time can be noted per cycle alongside the saturated discharge.
Do you need to see the signal heads?
Yes, or a reliable signal-phase log time-aligned to the footage. Discharge can only be timed against a known start of green.
Can you report in PCUs?
Yes, if you supply the PCU factors to apply. The raw classified discharge is always delivered alongside.
Related studies
- Turning Movement CountsApproach-by-movement matrices for left, through, right and U-turn paths at a junction.
- Roundabout CountsEntry, exit and circulating movements recorded by named arm.
- Queue Length AnalysisQueue extent recorded at defined approaches and reference points.
- Intersection CountApproach and movement data for junction analysis.
Get a quote for your saturation flow surveys
Share the study type, sites and approximate footage hours. We’ll confirm scope and reply with a quotation.